Erosion Control Plans

Erosion & Sediment

The C.3 requirements are separate from, and in addition to, requirements for erosion and sediment control and for pollution prevention measures during construction. The City requires all construction sites to have site-specific and seasonally-appropriate Best Management Practices (BMP) in the following categories:
Active Treatment System as needed
  • Erosion Control
  • Good Site Management
  • Non-Stormwater Management
  • Run-on or Run-off Control
  • Sediment Control
For projects disturbing one acre or more of land, the City is required to verify that the applicant has filed a Notice of Intent under the construction General Permit and has prepared a Stormwater Pollution Prevention Plan or SWPPP.